TLPT in brief
The DORA regulation requires financial entities designated by their authority to carry out a TLPT (Threat-Led Penetration Testing) at least every three years: an intelligence-led Red Team test, run on the production systems supporting critical functions. The method is based on the TIBER-EU framework, updated to align with the regulatory technical standards (RTS) that specify TLPT. These frameworks are detailed on redteam.onetosecure.com.
- 01PreparationScope, white team, providers
- 02IntelligenceTargeted threat and scenarios
- 03Red Team test12 weeks minimum, covert
- 04ClosureReports, replay, purple teaming
- 05RemediationAction plan and follow-up
Purple teaming in the closure phase
The closure phase of a TLPT confronts the attacker's view with the defender's. It includes:
- The Red Team report, with the detailed timeline of its actions;
- The Blue Team report, describing what it saw, analysed and did, once the exercise is revealed;
- A replay session, where both teams go through the attack step by step;
- A purple teaming exercise, where selected techniques are replayed collaboratively to understand the gaps and test improvements;
- The remediation plan and the summary sent to the authority.
Typical flow of closure purple teaming
Selecting the steps to replay
The white team, Red Team and Blue Team choose the most instructive steps: those that went undetected, those that were seen without a response, and the attack's tipping points.
Collaborative replay
The Red Team re-executes each step under controlled conditions, explaining its choices; the Blue Team watches its tools live.
Gap analysis
For each step: did the telemetry exist? Should a rule have fired? Was the alert handled? Which decisions were missing?
Improvements and validation
Creating or tuning detections, procedures and configurations; replay to validate.
Feeding the remediation plan
Improvements made and remaining feed the remediation plan presented to the authority, with owners and deadlines.
Before the TLPT: the rehearsal
The entities that approach a TLPT most calmly are often those that practised purple teaming beforehand:
Fix the obvious
One or two purple sessions on the most common techniques fix basic gaps before the test, so the TLPT can focus on advanced scenarios.
Prepare the organisation
Analysts learn to document their observations, which greatly eases writing the Blue Team report.
Measure progress
The coverage matrix established before the TLPT objectively measures the progress made after remediation.
Beyond finance: NIS2 and the effectiveness of measures
The NIS2 directive requires essential and important entities to have policies and procedures to assess the effectiveness of their cybersecurity risk-management measures (article 21). In Belgium, the CCB's CyberFundamentals framework points in the same direction.
Purple teaming meets this requirement very concretely:
| Requirement | What purple teaming brings |
|---|---|
| Assess the effectiveness of measures (NIS2, art. 21) | Real tests of detection, technique by technique, with documented results |
| Incident handling and detection | Proof that typical incidents would be detected and escalated |
| Resilience testing programme (DORA, art. 24-25) | Regular scenario-based tests, complementary to penetration tests |
| Continuous improvement | Progress metrics from one cycle to the next |
| Management accountability | Dashboards the management body can understand |
Frequently asked questions
Is purple teaming mandatory under DORA?
For entities subject to TLPT, replay and purple teaming are part of the closure phase defined by the TIBER-EU framework aligned with the TLPT RTS. For other entities, it is not required as such, but it is an excellent way to meet the requirement for a resilience testing programme.
Who facilitates closure purple teaming?
It brings together the TLPT Red Team, the Blue Team and the white team, under the supervision of the test lead. An experienced facilitator helps maximise the lessons in a short time.
How long does a TLPT closure take?
Generally several weeks: writing reports, replay, purple teaming, remediation plan and summary. The purple teaming itself often spans several days.
